Companies apply to rehabilitate the Maternal and Child Hospital

Leon, Guanajuato.- The eight companies that applied to carry out the internal remodeling of the León Maternal and Child Specialties Hospital in the Jol Gua Ber neighborhood did not exceed the official cost.

The work will cost 17 million 764 thousand 631.64 pesos and it contemplates an intervention of the areas of isolated, bedridden pediatrics and postpartum, expansion and remodeling of the critical obstetrics area, foundations and construction of the structure.

For example, the company Ingenio Capital SA de CV together with Construcciones Maroja SA de CV, applied with just 527.89 pesos less than the official cost.

It may interest you: The intensive therapy area of ​​the Hospital Materno Infantil de León will be expanded and rehabilitated

Meanwhile, Manavil Comercializadora SA de CV applied for an amount that differs by one million 820 thousand 344.04 pesos less.

As long as the contractor Ubrina García Urving Alejandro it postulated a work cost of less than one million 765 thousand 544.93 pesos less than what was established.

Although it is not prohibited to apply with prices lower than the estimated cost indicated in a national public tender, there are cases in which a tender is won and at the end of the work the cost is increased and the government entity ends up paying more.

On Thursday, October 14, the ruling will be made for the companies that have already visited the area to intervene.

In addition: No COVID wave has stopped the Celaya Maternal and Child Hospital

It was reported by the Secretariat of Infrastructure, connectivity and mobility that the renovations will begin on October 21.

This is intended to benefit 899 thousand 851 women, this sector is of childbearing age and gestation that require medical attention because they do not have the right to any type of health service.

In total, 513 square meters will be intervened, of which 192 correspond to the expansion and 321 m2 to the remodeling, the intervention area is just 27% of the total area of ​​the building that occupies a block.

The work also includes electrical, plumbing, medical gases, telecommunications and air conditioning installations.

In addition: They attend more than 6 thousand obstetric events at the Irapuato Maternal and Child Hospital

This is the second tender to carry out works in the HEMIL since it was tendered in August and none of the companies was creditor for what was considered deserted, that occasion Altec and Sifsa also participated.

The last intervention that the building had, was in 2019 when 22.8 million pesos were applied in different stages, mainly for the adaptation of spaces with better finishes.

JATR

Leave a Reply